Industrial Injection Exchange AE Code Stock Injector Ford 7.3L Power Stroke
⚠ Call for Availability
This item may be on backorder. Please contact us to confirm supplier availability and estimated lead time before ordering.
I acknowledge a $120 Core Charge will be added to my order. Core Refunds are issued after the eligible core is returned and approved. This $120.00 fee will be added to your cart.
This product is selected for proper fitment and compatibility with the listed engine application. Our team is available to assist with fitment questions, installation considerations, and supporting components to ensure a smooth install and reliable performance.
Got Questions? Feel free to email us or call us at (503) 235-1947
This is a exchange AE code injector for the Ford 7.3L Power Stroke. AE code injectors were originally fitted to 1999.5-2002 applications.
Key Features
- AE code cores are split shot injectors
- Long lead injector for the number 8 cylinder position only
Fitment
- Ford 7.3L Power Stroke
Product Details
- Brand: Industrial Injection
- Manufacturer Part Number: AEPS
- Product Type: HEUI fuel injector
- Condition: Exchange
Shipping Height: 3.0
Shipping Length: 10.0
Shipping Width: 5.0