Alliant Power AE Long Lead HEUI Injector AP63904AE Ford 7.3L Power Stroke
I acknowledge a $120 Core Charge will be added to my order. Core Refunds are issued after the eligible core is returned and approved. This $120.00 fee will be added to your cart.
This product is selected for proper fitment and compatibility with the listed engine application. Our team is available to assist with fitment questions, installation considerations, and supporting components to ensure a smooth install and reliable performance.
Got Questions? Feel free to email us or call us at (503) 235-1947
Remanufactured Alliant Power HEUI fuel injector, AE code, part number AP63904AE, for the Ford 7.3L Power Stroke and Navistar T444E. This is the long lead injector, identified by the LL stamp and blue harness connector, and it installs in the number 8 cylinder only. Ford specified it alongside standard AD injectors in cylinders one through seven to eliminate injector "cackle" noise, per service bulletins 00-10-1, 00-22-1, and 01-14-6.
Key Features
- Long lead (LL) injector with blue harness connector
- Number 8 cylinder position; use the AD code injector for cylinders 1 through 7
- Remanufactured to restore original fuel delivery and spray pattern
- Engines built after 12/07/1998
Fitment
- Ford F-250 HD (1997), F-350 (1996-1997), F-350 Super Duty (1999)
- Ford E-350 Super Duty (2001-2003)
- Ford E-350 Econoline (1996-1998), E-350 Club Wagon (2003)
- Ford E-350 Econoline Club Wagon (1996-1998, 2001-2002)
- Navistar T444E
The 7.3L uses several injector codes and they are not interchangeable. Confirm your engine build date and look for the LL stamp on the number 8 injector before ordering.
Product Details
- Brand: Alliant Power
- Manufacturer Part Number: AP63904AE
- Condition: Remanufactured
- Sold each; a core charge applies and your rebuildable core is returnable
Shipping Height: 3.25
Shipping Length: 9.75
Shipping Width: 4.25