{"product_id":"alliant-power-ae-long-lead-heui-injector-ap63904ae-ford-7-3l-power-stroke","title":"Alliant Power AE Long Lead HEUI Injector AP63904AE Ford 7.3L Power Stroke","description":"\u003cp\u003eRemanufactured Alliant Power HEUI fuel injector, AE code, part number AP63904AE, for the Ford 7.3L Power Stroke and Navistar T444E. This is the long lead injector, identified by the LL stamp and blue harness connector, and it installs in the number 8 cylinder only. Ford specified it alongside standard AD injectors in cylinders one through seven to eliminate injector \"cackle\" noise, per service bulletins 00-10-1, 00-22-1, and 01-14-6.\u003c\/p\u003e\n\n\u003ch3\u003eKey Features\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eLong lead (LL) injector with blue harness connector\u003c\/li\u003e\n  \u003cli\u003eNumber 8 cylinder position; use the AD code injector for cylinders 1 through 7\u003c\/li\u003e\n  \u003cli\u003eRemanufactured to restore original fuel delivery and spray pattern\u003c\/li\u003e\n  \u003cli\u003eEngines built after 12\/07\/1998\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eFitment\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eFord F-250 HD (1997), F-350 (1996-1997), F-350 Super Duty (1999)\u003c\/li\u003e\n  \u003cli\u003eFord E-350 Super Duty (2001-2003)\u003c\/li\u003e\n  \u003cli\u003eFord E-350 Econoline (1996-1998), E-350 Club Wagon (2003)\u003c\/li\u003e\n  \u003cli\u003eFord E-350 Econoline Club Wagon (1996-1998, 2001-2002)\u003c\/li\u003e\n  \u003cli\u003eNavistar T444E\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eThe 7.3L uses several injector codes and they are not interchangeable. Confirm your engine build date and look for the LL stamp on the number 8 injector before ordering.\u003c\/p\u003e\n\n\u003ch3\u003eProduct Details\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eBrand: Alliant Power\u003c\/li\u003e\n  \u003cli\u003eManufacturer Part Number: AP63904AE\u003c\/li\u003e\n  \u003cli\u003eCondition: Remanufactured\u003c\/li\u003e\n  \u003cli\u003eSold each; a core charge applies and your rebuildable core is returnable\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Alliant Power","offers":[{"title":"Default Title","offer_id":47335969095853,"sku":"AP63904AE","price":215.05,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0747\/5200\/0173\/files\/1accc95e-9336-4d7d-863d-890952373c2e.jpg?v=1787854200","url":"https:\/\/www.dfispdx.com\/products\/alliant-power-ae-long-lead-heui-injector-ap63904ae-ford-7-3l-power-stroke","provider":"Diesel Fuel Injection Service","version":"1.0","type":"link"}