{"product_id":"alliant-power-ae-long-lead-heui-injector-ap63804ae-1999-2003-ford-7-3l","title":"Alliant Power AE Long Lead HEUI Injector AP63804AE 1999-2003 Ford 7.3L","description":"\u003cp\u003eNew Alliant Power AE long lead HEUI fuel injector, part number AP63804AE, for the 1999-2003 Ford 7.3L Power Stroke and 2002-2003 Navistar T444E. This is the long lead injector, identified by the LL stamp and blue harness connector, and it installs in the number 8 cylinder only. Ford specified it alongside standard AD injectors in cylinders one through seven to eliminate the injector \"cackle\" noise, per service bulletins 00-10-1, 00-22-1, and 01-14-6.\u003c\/p\u003e\n\n\u003ch3\u003eKey Features\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eLong lead (LL) injector with blue harness connector\u003c\/li\u003e\n  \u003cli\u003eNumber 8 cylinder position; use AP63803AD for cylinders 1 through 7\u003c\/li\u003e\n  \u003cli\u003eBrand new, genuine original equipment, not remanufactured\u003c\/li\u003e\n  \u003cli\u003eFit, form, and function tested against original equipment standards\u003c\/li\u003e\n  \u003cli\u003eNew copper chamber gasket and seals included\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eFitment\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eFord F-250 Super Duty, F-350 Super Duty, E-350 Super Duty (1999-2003)\u003c\/li\u003e\n  \u003cli\u003eFord Excursion (2000-2003)\u003c\/li\u003e\n  \u003cli\u003eNavistar T444E (2002-2003)\u003c\/li\u003e\n  \u003cli\u003eEngines built after 12\/07\/1998\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003eFord F-Series engine serial range 661,496 to 896,812. Ford E-Series engine serial range 661,974 to 896,812. Navistar T444E engine serial range 1,313,828 to 5,999,999. Confirm your engine serial number and look for the LL stamp on the number 8 injector before ordering.\u003c\/p\u003e\n\n\u003ch3\u003eProduct Details\u003c\/h3\u003e\n\u003cul\u003e\n  \u003cli\u003eBrand: Alliant Power\u003c\/li\u003e\n  \u003cli\u003eManufacturer Part Number: AP63804AE\u003c\/li\u003e\n  \u003cli\u003eCondition: New\u003c\/li\u003e\n  \u003cli\u003eSold each; a core charge applies and your rebuildable core is returnable\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch3\u003eAlso Replaces\u003c\/h3\u003e\n\u003cp\u003eInterchanges with Ford F81Z-9E527-EARM, XC3Z-9E527-AARM, F61Z-9VE527-ERM, and 5C3Z-9VE527-ARM, and Navistar 1833639C1, 1833640C1, 1833644C1, 1833645C1, 1833646C2, and 1833647C91.\u003c\/p\u003e","brand":"Alliant Power","offers":[{"title":"Default Title","offer_id":47323901165741,"sku":"AP63804AE","price":366.57,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0747\/5200\/0173\/files\/248_222807b7-8830-41a3-9bcf-2d73f015532e.jpg?v=1787758741","url":"https:\/\/www.dfispdx.com\/products\/alliant-power-ae-long-lead-heui-injector-ap63804ae-1999-2003-ford-7-3l","provider":"Diesel Fuel Injection Service","version":"1.0","type":"link"}